Zoom connection: https://liverpool-ac-uk.zoom.us/j/9781172076
Trello: https://trello.com/invite/b/7GoqPn1A/98d6eb20cb5c0a5015fdd360a9c57406/darkside20k-vpdm-cold-stand
Outstanding/key items:
Schedule:
https://docs.google.com/spreadsheets/d/1VkFDMUSEm2nXOUux-wnFonVq2NV_Z2mnwiRTxISHs3c/edit#gid=653252054
Astrocent will use CAEN VX2740 boards.
MIDAS is working. Will look at setup steps for other test stands.
Working on stiff design for connecting fiber to laser coupler.
Task for Liverpool: Share diffuser positions and check with simulations if coverage is acceptable.
Considering working towards a light source available late December if possible - TBD.
Liverpool construction schedule:
https://docs.google.com/spreadsheets/d/1xaXyx5qR3-0kjym95AVhqFfvZychM2DMPLjtj5JwlV4/edit?usp=sharing
DB50 signal feedthroughs into CAEN VX2745 using custom HDMI adapter PCB for pin headers on front panel.
DB50 power feedthroughs into either CAEN or desktop Keithley/Keysight power supplies.
Grounding and cable shielding.